← All industries Electronics & Electrical

ERP built for electronics & electrical manufacturers

Multi-level BOMs, component shortages and serial tracking — handled in one system, so a missing ₹8 part never stalls an entire build again.

app.dravyaa.com
Components tracked
2,340
all locations
Short for next build
12
POs pending
Units serialised
8,500
this year
Assembly outputLive
Sound familiar?

The problems electronics units bring to us

Shortage discovered mid-build

Assembly starts, and then one ₹8 component runs out — stopping a ₹8-lakh batch while everyone scrambles for stock.

BOM versions everywhere

The latest BOM lives in someone's inbox. Stores issues parts from an old version, and nobody catches it until testing.

Warranty blind spots

A unit comes back under warranty and there's no record of which component lot went into it — so every claim becomes guesswork.

How Dravyaa helps

Everything an electronics unit needs, in one system

Dravyaa production summary report: orders and batches, completion, yield and lead time with planned, good and rejected quantities
The production summary: completion, yield and lead time across every build in the period.

Multi-level BOMs

Assemblies, sub-assemblies and hundreds of components in one structure — with a single current version everyone works from.

Shortage-free planning

Material availability checked against BOMs before work orders start — shortages flagged while there's still time to buy.

Serial number tracking

Serialise finished units so each one carries its warranty and service history from the day it ships.

Component lot traceability

Know which component lot went into which unit — so a bad lot means a targeted recall, not a blanket one.

Vendor price comparison

Track vendor-wise component pricing on POs — compare what each vendor charged and negotiate from real data.

GST billing & e-invoicing

GST invoices, e-invoices and e-way bills — compliant by default, books ready for filing.

Outcomes

Builds that don't stop mid-way

  • ✓Shortages flagged before assembly starts, not during — POs raised while there's still lead time.
  • ✓One current BOM everyone works from — stores, purchase and production stay in sync.
  • ✓Warranty claims resolved with serial-level history instead of guesswork.
  • ✓Purchase planned from real BOM demand, not gut feel or last month's Excel.
Stock accuracy
99%
BOM levels supported
Multi-level
Typical reduction in line stoppages
70%+
FAQ

Common questions from electronics manufacturers

Can Dravyaa handle BOMs with hundreds of components?

Yes. Multi-level BOMs with sub-assemblies keep an assembly with hundreds of components organised as one structure — from PCB-level parts up to the finished unit.

Does Dravyaa check material availability before production?

Yes. You get shortage visibility against work orders — see which components are short for upcoming builds and raise POs in time, before assembly starts.

Can finished units be tracked by serial number?

Yes. Serial number tracking means every finished unit carries its production and component history — so warranty and service claims get resolved with data, not guesswork.

Does Dravyaa support vendor-wise price comparison for components?

Yes. The purchase module keeps vendor-wise pricing history on purchase orders, so you can compare what each vendor charged for the same component.

Implementation

Going live in 30 days: how a electronics unit is set up

The same four steps every Dravyaa customer follows — a mid-year cutover is fine, as long as the opening balances are taken on the cutover date. Case study: going live mid-year with clean opening balances shows it on a real tenant.

Week 1 — masters

Import items, customers and vendors from CSV; registered parties are pulled by GSTIN so names and addresses come from the GST portal, not retyped. Set up component part numbers with multi-level BOMs, warehouses and GST rates.

Week 2 — opening position

Load opening stock per warehouse at cost and party-wise debtor and creditor balances as at the cutover date (the same figures as the previous system's trial balance). Bank and cash opening balances go in last.

Week 3 — BOMs and parallel run

Enter the active BOMs and routings, run one week of real purchases, production and sales alongside the old system, and compare stock, GST and party statements line by line.

Week 4 — go-live

Freeze the old system on the cutover date, remove the demo data, hand each user their role, and file the first GSTR-1 and GSTR-3B from Dravyaa's books.

Works with

Modules electronics units use most

See Dravyaa on your BOMs & builds

A 20-minute walkthrough with your own components, assemblies and serial numbers.

Book a Demo